Toilet block update as at 31 July 2022

Wooden beams at the BBQ end of the block.

In the last couple of weeks the BBQ end of the block is really taking shape, with beams for the roof.

Photos, as usual, have been edited to remove graffiti.

We’ve had so much rain lately and water has pooled on the new concrete rather than draining away through the installed grates. When I asked about that I was told the water will drain away into a soak pit, but there’s some difficulty at the moment about the location of the soak pit. Meanwhile the rainwater will be helping the concrete to cure.

Photos below are from 22 July 2022 (the first 3) and then 29 July 2022.

Toilet block end with walls built up.
BBQ end with a couple of posts in place.
Toilet block end from the Reserve.
Toilet block end from the Reserve, a week later.
BBQ end from the Reserve.
BBQ end from the front.
Toilet block end from the front.
Waikawa News @WaikawaNews