Toilet block progress as at 08 July 2022

Front view of toilet block with extra bricks and framed doorways.

In the last two weeks there has been visible progress on the toilet block. Extra bricks have been added to the walls and framing for doorways has been installed. Several photos have been doctored to remove annoying graffiti.

It’s really starting to take shape now.

Toilet block end, from the reserve.
BBQ end from the reserve.
BBQ end, side on.
BBQ end from the street.
Toilets end from the street.
Toilets end from the reserve.
Waikawa News @WaikawaNews