Toilet block progress as at 25 June 2022 Published at 07:19 on 26 June 2022 Concrete floor for the BBQ area. This week the concrete floor was laid in the BBQ and shower areas. The other end doesn't seem to have changed. ✍️ Reply by email Waikawa News @WaikawaNews