The focus in this stormy week has been on getting ready for concrete.
Note: the high seas (6 metre open sea swell), high tide, high river on 13 June 2022 flooded the bottom end of Hank Edwards Reserve. The water came right up to the fence around the building site. See the Facebook post. There are also driftwood photos in another post after this one.